Current site: Peikko Group Global (English). Do you want to change country or language?

Peikko Group Global (English)

MEOS Campus, Regensburg, Germany

  • Building Type:
  • Office Buildings
Fullscreen map Close Street View

30% less slab thickness thanks to DELTABEAM®.

The barrier-free building ensemble combines a total of four interconnected buildings, each of which is separately accessible. With around 27,600 m², tenants have access to bright, modern space for offices, research & development and light industrial. A DGNB gold certification is in preparation.

Thanks to its concept based on renewable energies, the MEOS Campus is operated in a CO₂-neutral manner. This means that operating costs can be kept low in the long term and ESG strategies can be implemented.

Thanks to their many advantages, the DELTABEAM® composite beams from Peikko were able to convince OPTIMAL planTech GmbH. By using them, around 30% of the slab thickness could be saved in the project, resulting in significant CO₂ savings. The lack of visible beams enabled easy and space-saving HVAC installations and accelerated the construction process. The reduction in cubic meters per square meter also resulted in lower heating and cooling costs.

Read more down-arrow.png

Project facts

Project size:
27.600 m2
Developer:
OPTIMAL planTech GmbH
Construction Company:
Bachl - Haus 1 / Max Bögl - Haus 2-4
Structural Designer:
OPTIMAL planTech GmbH
Delivery year:
2020
Completion year:
2023

Contact us

Sascha Schaaf

Sascha Schaaf

Project Development Manager

Tel. +49 6436 916464
Mob. +49 175 271 2173
[email protected]