Current site: Peikko Group Global (English). Do you want to change country or language?

Peikko Group Global (English)

Latest blog articles

February 18, 2021

Building in wintertime – 4 things to take into account

Building in subzero temperatures is challenging. Here’s the Top 4 tips from the probuilder.

February 4, 2021

DELTABEAM® used at Helsinki Airport to meet customer’s special needs

A new, larger Terminal 2 is being built at Helsinki Airport to replace the existing T2 terminal. Peikko DELTABEAM® Frame is used in the project – so P...

January 13, 2021

Stronger than ever: past, present, and future of Bolted Column Connections

My first contact with Peikko and its column shoe connections was in 1989, when I worked through the summer at a building site.

December 15, 2020

DELTABEAM® Slim Floor Structure - safe and efficient way to build in seismic areas

An estimation is that 600 million people are living in tectonically active areas by 2025. These are areas that are affected by earthquakes, volcanic a...

November 23, 2020

Strusoft FEM-Design Makes the DELTABEAM® Design Process Lean

Peikko’s products are aimed to provide solutions to make building processes faster, safer, and more efficient. Often that means that each building nee...

November 2, 2020

DELTABEAM® with hollow-core slabs - Enabling fire safety without compromising performance

Peikko’s new White Paper, DELTABEAM® in combination with hollow-core slabs in fire case, presents the background, results, and conclusions of a series...

October 26, 2020

Corporate Responsibility: How to do it?

Peikko aims to change the construction industry to be faster, safer, and more efficient. But it is not enough to state only what we do, but also how w...

October 20, 2020

Corbel design verified

Peikko has launched a new White Paper on the project: Composite Columns: Corbel design development.

October 13, 2020

Circular Steel Plate Innovation

How has Peikko reduced steel waste by a million kilograms?