Current site: Peikko Group Global (English). Do you want to change country or language?

Peikko Group Global (English)

Sports World, Sindelfingen, Germany

  • Building Type:
  • Sports Arenas
Fullscreen map Close

Hybrid Timber Slabs for the extension of a Sports Facility

The existing gym of the VfL Sindelfingen became too small to accommodate the growing number of members. The extension is connected to the existing building at the same level as the floor. Nusser Systembau chose the combination of DELTABEAM® and composite timber slabs for the load-bearing structure.

This enables very slim but long-span slabs. The ceiling is combined with an air-conditioning system that ensures draught-free heating and ventilation of the spaces. Since the exhaust air is routed through a thermal exchanger, the building's operating expenses were reduced.

A high-voltage power line that passes over the building at a low height posed a challenge for the construction company, as it meant that only a very low lifting height was available for the crane. The topmost beam layer could only be mounted with the help of a specially made lifting beam.

Nusser specializes in timber system construction and has frequently collaborated with Peikko in the past, so the design proceeded very smoothly.

Read more down-arrow.png

Project facts

Project size:
2 000 m2
Floors:
3
Developer:
VfL Sindelfingen
Construction Company:
Wilhelm Nusser GmbH Systembau
Structural Designer:
MSIng
Architect:
Dipl.-Ing. (FH) Jürgen Aulehla
Delivery year:
2020

Contact us

Matthias Wölfel

Matthias Wölfel

Außendienst Süd

Technischer Vertrieb

Mob. +49 171 5742229
[email protected]